Kenco-engineering Thermal Differential Switch Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Sensoren Kenco-engineering Thermal Differential Switch herunter. Kenco Engineering Thermal Differential Switch User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 8
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Page 1
KENCO ENGINEERING COMPANY
P.O. BOX 470426 TULSA, OK 74147-0426 PHONE: (918) 663-4406 FAX: (918) 663-4480
www.kenco-eng.com e-mail: [email protected]
SERIES KTD THERMAL DIFFERENTIAL FLOW/LEVEL SWITCH
INSTALLATION / OPERATION INSTRUCTIONS
TABLE OF CONTENTS
1. GENERAL DESCRIPTION ............................................................. 2
2. PRINCIPLE OF OPERATION ......................................................... 2
3. MODEL DESCRIPTION .................................................................. 2
4. INSTALLATION .............................................................................. 3
5. WIRING CONNECTIONS................................................................ 4
6. OPERATIONAL CHECK................................................................. 5
7. PRE-CALIBRATION ....................................................................... 5
8. CALIBRATION (Level Switch)....................................................... 6
9. CALIBRATION (Flow Switch)........................................................ 7
10. MAINTENANCE & TROUBLESHOOTING ..................................... 8
11. SPECIFICATIONS .......................................................................... 8
Seitenansicht 0
1 2 3 4 5 6 7 8

Inhaltsverzeichnis

Seite 1 - KENCO ENGINEERING COMPANY

Page 1 KENCO ENGINEERING COMPANY P.O. BOX 470426 TULSA, OK 74147-0426 ● PHONE: (918) 663-4406 FAX: (918) 663-4480 www.kenco-eng.com e-mail: info@ken

Seite 2

Page 2 GENERAL DESCRIPTION The Series KTD Thermal Differential Switch is the state-of-the-art in gaseous and liquid flow switching or liquid level / i

Seite 3

Page 3 INSTALLATION Unpack the switch carefully. Inspect all units for damage. Report any damage to carrier immediately. Check the contents against

Seite 4

Page 4 Electrical Installation It is recommended that conduit be installed onto the ¾” NPT connection on the electronics housing. A seal drain fittin

Seite 5

Page 5 4. Pull the power/signal wires through the conduit opening. 5. Connect Power and relay wiring to Terminal Block (TBB) see figure on

Seite 6

Page 6 J2 – This sets the Failsafe condition of the switch. The jumper should cover the (2) left-most pins for High Level Failsafe (HLFS) conditi

Seite 7

Page 7 CALIBRATION (Flow Switch) (Refer to Page #5 for location of controls) NOTE: For optimum performance, the calibration must be do

Seite 8

Page 8 MAINTENANCE & TROUBLESHOOTING The sensor can be cleaned by soaking, spraying or ultrasonic cleaning. Verify material compatibility before

Kommentare zu diesen Handbüchern

Keine Kommentare